After meticulously researching and testing the top providers on the market, we’ve determined that monday.com is the best project management platform for businesses. It’s very easy to get started on, affordable — with feature-rich plans starting from £8 per month — and full of advanced automation and AI capabilities.

However, monday.com isn’t perfect. It falls short in a couple of areas that some users may consider to be absolutely crucial, like customer support. In addition, Asana will be slightly easier to drop into existing workflows, while Wrike will likely be a better option for larger enterprises seeking advanced reporting and stronger formal security certifications.

If you’re looking for a project management platform, but haven’t made up your mind yet, this is the page for you. Here we’ll go over the pros, cons, features (including template offerings like Gantt charts) and verdict for five project management providers.

How Did We Research the Best Project Management Software?

To identify the best project management software, we tested and researched 10 leading platforms used by UK businesses. Products were assessed across core testing categories and nine subcategories, with weighted scoring applied to reflect the priorities and needs of business users.

Main testing categories included:

  • Pricing: We consider subscription costs, licensing fees and value for money.
  • Ease of use: We test for user experience, interface design, navigation and task management.
  • Features: We assess the quality of project planning, collaboration, scheduling and task tracking tools.
  • Integrations: We check for compatibility with third-party software and leading business tools.
  • Security: We monitor the quality of data protection measures and security accreditations.
  • Customer support: We assess the availability and quality of phone, email, chat, and online support resources.

This process ensured fair, balanced and practical recommendations for businesses comparing project management software. Learn more about our full methodology below.

Best Project Management Software: Key Takeaways

  • monday.com is the best project management software overall. It offers the strongest combination of ease of use, automation, AI features, project views and value for money, making it suitable for most businesses.
  • ClickUp offers the best value for power users. It delivers extensive customisation, AI tools and automation at a lower cost than monday.com, but requires more setup and training.
  • Asana is the strongest choice for integrations. Its extensive marketplace and seamless connections with tools like Slack, Microsoft Teams, Google Workspace and Salesforce make it ideal for connected workflows.
  • Different business sizes require different solutions. Small businesses often benefit from monday.com or ClickUp, while medium-sized and larger organisations may require more specialised platforms, like Wrike, Jira or Teamwork.
  • Automation and AI are now key project management features. The top-ranked providers increasingly use AI assistants, workflow automation and no-code tools to reduce manual work.

What Are the Best Project Management Software Providers?

Our top-rated project management software providers are monday.com, Asana, Wrike, Teamwork and ClickUp, each standing out for different strengths. monday.com earned the top spot as the best overall platform, while Asana impressed for integrations, Wrike for user satisfaction, Teamwork for collaboration and ClickUp as the strongest all-round alternative.

0 out of 0
Price range (billed annually)
Price range (billed monthly)
Key features
Free plan
Free trial

monday.com

Asana

Wrike

Teamwork

ClickUp

£8–£17 (then custom)/user/month

£8.49–£16.99 (then custom)/user/month

No option

£9.99–£24.99 (then custom)/user/month

$7–$12 (then custom)/user/month (prices only in USD)

£11–£21 (then custom)/user/month

£11.59–£25 (then custom)/user/month

$10–$25 (then custom)/user/month (prices only in USD)

£13.99–£29.99 (then custom)/user/month

$10–$19 (then custom)/user/month (prices only in USD)

  • Gantt chart
  • Over 200 templates for projects and items
  • Sub-tasks, milestones and dependencies
  • An impressive amount of integrations
  • Pre-built and custom automations
  • Robust form builder
  • Gantt chart, milestones, dependencies and sub-tasks
  • Unlimited projects and users on the free plan
  • Automation builder
  • Great collaboration features on every plan
  • Comprehensive task management features
  • Solid customer support on every plan
  • Great task management features
  • Preset and custom templates and automations
  • 24/7 live chat and email support
Try monday.com Compare Quotes Try Wrike Try Teamwork Try ClickUp

1. monday.com: Best Overall Platform

Monday Logo
monday.com
4.6
Pricing £8-£17/user/month
Quick overview

monday.com is our number one project management software platform. While it does almost everything well, the aspects that are particularly worthy of praise are its amount of features, and its simple (yet deep) user interface, which allows for both easy interaction and complex project management.

In our research, monday.com scored the highest user satisfaction score (4.5/5) out of any provider on this list. This is due to their smooth and well-colour-coded interface — monday scoring a cool 4.1/5 when it comes to usability. As for its features score (4.2/5), this is backed up by its great list of tools, including custom and preset charts and automations, Gantt charts and kanban boards, and task dependencies and milestones.

The one significant shortcoming of monday.com is its customer service. As easy-to-use as the product is, if you do encounter any roadblocks, the customer service offerings within monday.com aren't great. They're essentially email only, which means you won't get an immediate answer for any time sensitive issues.

Strengths

Strong range of features

Great user experience

Easy automation builder

Weaknesses

Subpar customer support

Arbitrary limits on lower tiers

Pricing
PlanPaid yearlyPaid monthly
Basic £8/user/month £11/user/month
Standard £11/user/month £13/user/month
Pro £17/user/month £21/user/month
Enterprise Custom Custom

What are monday.com’s key features?

  • Gantt, timeline, kanban and calendar views for projects and tasks
  • Over 200 templates, low-code automations and AI assistants for routine work
  • Sub-tasks, milestones, dependencies, time tracking and workload views
  • Native iOS and Android apps with robust offline support
  • Excel/CSV import, open API, and enterprise-grade security (ISO 27001, SOC 2, GDPR, HIPAA)
  • AI-powered, no-code app builder that lets you build custom applications (monday Vibe)
monday.com dashboard view with subitems
We found monday.com to be a breeze in terms of usability, with its aesthetic dashboard being easy to get to grips with and create items/sub-items for your planning. Source: Expert Market

How does monday.com compare with other project management software?

monday.com is our top pick for UK businesses that want an all-round project management platform that’s easy to roll out across different teams.

ClickUp is slightly cheaper but monday.com is stronger overall

In our testing, monday.com usually emerges as the most rounded option overall, combining high user satisfaction with one of the broadest feature sets in this guide. ClickUp typically undercuts monday.com on price and offers more granular configuration and power-user options, but has a steeper learning curve for non-technical teams.

monday.com’s cleaner interface, opinionated templates and simpler automation builder make it easier to roll out quickly across mixed-skill teams, while ClickUp suits teams prepared to invest more time in set-up and customisation.

Monday.com CRM showing different column options you can create within the web-app
monday.com shines when it comes to customization. Here's a glimpse at its Column Center. Source: Expert Market

Smartsheet is better than monday.com for teams relying on Excel

For teams moving from Excel, Smartsheet still offers the closest “spreadsheet-style” experience and deeper grid functions, but tends to feel more rigid and less approachable than monday.com’s colourful boards and AI-assisted workflows. So, we’d say monday.com is the better fit when you want strong integrations and automation, without living full-time in a grid.

Zoho Projects and Trello are cheaper than monday.com, but more limited

Zoho Projects and Trello remain cheaper choices for small teams that mainly need basic task tracking and a kanban board, and they both offer capable mobile apps. However, monday.com goes further with built-in automations, multi-view reporting, strong security certifications and more structured portfolio management.

For UK businesses planning to scale or needing robust governance and auditability, monday.com generally justifies its higher price. Budget-constrained micro-teams that don’t need this depth may find Zoho Projects or Trello sufficient.

Researcher Verdict

“monday.com can very much be used to facilitate the post-project stage. Of particular note is the whiteboard feature, which can be used to hold an effective interactive session for feedback.

monday.com also covers the practical elements, such as providing read-only access to clients or other stakeholders who may need to view the project post-completion.

Whilst it does provide a form-builder (which is a bonus), it’s not particularly intuitive to use if you’re familiar with other form-building software.”

James Macey Senior Researcher

2. Asana: Best for Integrations

Asana Logo
Asana
4.5
Pricing £8.49-£16.99/user/month
Quick overview

Despite not making it into the top three, Asana is a very respectable project management platform, pulling in a score of 4.5/5. Its main appeals are its low pricing, its high number of features and its customer satisfaction score (3.9/5).

The biggest jewel in Asana's crown is its massive list of integrations. These include CRM, marketing, data/reporting and communication integrations. This can lead to a huge amount of personalisation within your software and allow you to use tools that aren't otherwise included in Asana's original offerings.

As seems to be a common theme in the higher ranked software, however, Asana falls short when it comes to its customer service offerings, scoring a 2.8/5. It only offers email contact with the business, meaning that time-sensitive issues might be under more stress than they need to be a with a platform that supports live chat or phone calls, like Teamwork.

Strengths

Great integration marketplace

Very fair pricing

Great project creation and workflow features

Weaknesses

Poor customer service offerings

Lacks time-tracking and invoicing features

Pricing
PlanPaid yearlyPaid monthly
Starter £8.49/user/month £11.59/user/month
Advanced £16.99/user/month £25/user/month
Enterprise Custom Custom

What are Asana’s key features?

  • List, board (kanban), timeline (Gantt-style) and calendar views for projects and tasks
  • Rules-based automation, custom fields, dependencies and forms for structured intake and workflow control
  • Large integrations marketplace connecting Asana to Slack, Microsoft Teams, Google Workspace, Salesforce and more
  • iOS, Android and desktop apps with offline support for key actions like viewing, updating and completing tasks
  • CSV import from spreadsheets and other tools, plus CSV export for reporting; SOC 2, ISO 2700x and GDPR-aligned security
asana board view on its project management software free plan
We found Asana's aesthetic to be attractively sleek and very similar to Teamwork's UI overall. Source: Expert Market

How does Asana compare with other project management software?

We see Asana as a flexible, integration-first option that sits between simple task tools and heavier project portfolio platforms. It’s particularly appealing when you want a clean interface, strong app connections and clear ownership of tasks across multiple teams.

Asana is more traditional than monday.com

Compared with monday.com, Asana is a little more traditional: you work mainly in lists and boards, with a strong emphasis on tasks, owners and due dates, while monday.com leans more into visual boards and highly customisable dashboards. We think Asana is slightly easier to drop into existing workflows if you live in email, Slack or Teams, because its integrations are so central to the product.

Asana is easier to get started on than Smartsheet and Jira

Against Smartsheet, Asana is less “spreadsheet-like” but more approachable for non-project managers: you still get timelines, dependencies and dashboards, but you’re not forced to work in a grid if you don’t want to.

Smartsheet remains stronger for detailed, grid-based planning and hybrid waterfall projects, while Asana is better for campaign-style work and cross-team coordination.

Compared with Jira, Jira is still the better choice for deep agile software delivery with epics, sprints and release workflows, whereas we think Asana is more suitable for cross-functional business teams who want a lighter structure that marketing, product, ops and leadership can all understand.

Asana is pricier but more comprehensive than Zoho Projects and Trello

Zoho Projects and Trello usually win on price and simplicity, and they’re perfectly adequate for small teams that just need task lists and basic boards. We think Asana earns its higher price when you need deeper workflow control, native forms, richer integrations, proper security certifications and more structured governance across multiple teams.

If keeping costs down is your only priority, Zoho Projects or Trello are fine. If you expect to grow, work with external clients, or rely heavily on tools like Slack, Google Workspace and Salesforce, Asana is the more future-proof choice.

Researcher Verdict

“Asana is quite a capable solution for the post-project stage. This is because it provides an easy-to-use form builder which can be used to create feedback surveys. Interactive sessions are also possible via customisable kanban (but not an ideal solution).

It also provides dedicated features which can facilitate a handover. There is a dedicated feature for inviting guests to view a project and files can be easily stored.”

James Macey, Senior Researcher
-
Did You Know?

Investing in solid project management software is a great way of keeping track of your company’s productivity when you’re supporting your staff’s side hustles.

3. Wrike: Best for User Satisfaction

Wrike Logo
Wrike
4.4
Pricing $9.80-$24.80/user/month (USD only)
Quick overview

Wrike's strengths lie in its usability and user satisfaction. It has a lovely, smooth interface that allows users to quickly and easily use its various features to facilitate their project process.

Outside of the interface, some of the specific highlights include its project creation and workflow features. These include a Gantt chart, a kanban and spreadsheet view, sub-tasks, milestones, and dependencies. You'll also be given preset and custom project templates, and custom automations on the Business plan.

Sadly, Wrike falls short when it comes to customer service, scoring a dismal 1.8/5, as they only offer email services. This is already disappointing, but when paired with the higher-than-average price, it  becomes especially frustrating. Also, while it has an automation builder, this can be tricky to get a handle on.

Strengths

Good project creation and workflow features

One of the best user experiences for straightforward project management

Weaknesses

Fairly expensive

Automation builder can be tricky

Pricing
PlanPaid monthly
Team $10/user/month
Business $25/user/month
Enterprise Custom

What are Wrike’s key features?

  • Interactive Gantt charts, scrum/kanban boards, dashboards and built-in time tracking
  • Custom workflows, request forms and powerful no-code automation with AI “Work Intelligence”
  • Excel/CSV import and export for migrating or reporting project data
  • Enterprise-grade security and compliance (SOC 2, ISO 27k series, GDPR, HIPAA-ready controls)
  • Full-featured iOS and Android apps with offline access to tasks, dashboards and approvals
board view in Wrike free project management software
We loved how Wrike's kanban view allows you to show plenty of information without us having to click into a respective card, including a last modified date, linked channels and even imagery. Source: Wrike

How does Wrike compare with other project management software?

We see Wrike as a heavyweight option for complex work: it’s more powerful than many rivals on automation, reporting and security, but also more expensive and harder to learn than tools aimed at smaller teams.

Wrike is better suited to large enterprises than monday.com

Compared with monday.com, we think Wrike is better suited to enterprises that need rigorous governance, resource planning and layered reporting.

Wrike offers deeper resource and workload views, more advanced reporting and stronger formal security certifications, whereas monday.com focuses on a friendlier interface, simpler configuration and better value for small-to-mid-sized teams.

Wrike and ClickUp are similar, but Wrike focuses on structure and operational control

Meanwhile, ClickUp and Wrike overlap on all-in-one work management, but they feel different in practice. ClickUp is cheaper on most tiers and packs in a huge number of views and features for the price, which can make workspaces quite busy.

Wrike tends to be more structured and selective, with more mature resource management, request-intake forms and enterprise reporting, so we think it fits organisations that prioritise process control and auditability over experimentation and low cost.

Wrike’s enterprise-level features make it more expensive than most competitors

If price is a key driver, Wrike will usually cost more per seat than monday.com, ClickUp or Zoho Projects once you’re on the Business or Enterprise tiers. In exchange, you’re getting enterprise-ready security, advanced automation, and stronger governance features.

For many small UK businesses, that premium won’t be necessary, but for regulated teams or agencies juggling large client portfolios, Wrike’s depth and compliance stance can justify the higher ongoing spend.

Researcher Verdict

“Wrike isn’t built for the post-project feedback stage. It does provide a form-building feature, but it is far more effective for its intended purpose of creating a funnel for incoming work requests. Users will need to create a custom kanban board for group feedback sessions.

It is a practical option for storing files and providing guest access. Files can be attached to specific tasks, which can then be accessed by anyone with access to the project. This includes guests. Wrike has a specific user-permission called ‘External user’ for the purpose of providing access to external stakeholders.”

James Macey, Senior Researcher
-

4. Teamwork: Best for Collaboration

Teamwork Logo
Teamwork
4.3
Pricing £9.99-£24.99/user/month
Quick overview

As the name would imply, Teamwork is great at collaboration features. On its lowest paid tier, Teamwork includes a calendar, instant messenger, a message board, task comments and document editing. As one would hope, the task management features are also great, including Gantt charts, kanban boards, time-tracking, sub-tasks, dependencies, milestones and custom fields.

Tying into the theme of teamwork, the customer support options are great, with live chat, phone lines and email support being offered on every plan. Also worthy of note is Teamwork's amount of integrations. HubSpot, Mailchimp, Slack and Microsoft Teams all feature throughout, and there are entire lists of finance and data/reporting integrations that can be installed.

However, as always, there are some downsides. It's on the pricier side of the project management spectrum. There also isn't any automation to speak of, so you'd better hope your own team's teamwork is on its peak performance.

Strengths

Great collaboration and task management features

Great customer support

Good user experience

Weaknesses

On the pricier side

No automations

Pricing
PlanPaid yearlyPaid monthly
Deliver £9.99/user/month £13.99/user/month
Grow £24.99/user/month £29.99/user/month
Scale Custom Custom

What are Teamwork’s key features?

  • Client-work focus with built-in time tracking, billable rates, budgeting and profitability dashboards
  • Multiple views — list, board, table, Gantt chart and calendar — for planning and tracking work
  • Collaboration tools include message boards, task comments, file sharing and optional free client users
  • Excel and Microsoft Project imports, plus CSV/Excel export for reporting or migration
  • Native iOS and Android apps, secured by SOC 2 and ISO 27001 controls and GDPR-aligned processes
teamwork software chat feature
Using the chat feature, which is available on every Teamwork plan, you can effectively communicate with your team instantly, rather than with the card item comment system found on software like monday.com. Source: Expert Market

How does Teamwork compare with other project management software?

We think Teamwork is strongest for agencies, consultancies and other client-service teams that need deep time and budget tracking, as well as everyday task management.

Teamwork has stronger client-focused features than monday.com and ClickUp

Compared with monday.com and ClickUp, Teamwork goes further on billable time, rate cards, invoicing and profitability reporting that are designed around client work, along with dedicated client-user roles.

monday.com and ClickUp offer broader template libraries, highly visual dashboards and heavier use of automations, so they can be quicker to roll out for purely internal projects, but they usually need extra configuration or third-party tools to match Teamwork’s client billing and profit reporting.

Teamwork is better for client work than Smartsheet and Asana

Smartsheet and Asana are better fits if your priority is spreadsheet-style project planning or marketing and campaign workflows, backed by very large template and integration ecosystems.

We think Teamwork beats both once you need detailed time tracking tied to budgets, retainers and invoices for multiple clients, because its reporting and cost-management tools are built specifically for client work rather than internal projects.

Zoho Projects and Trello are cheaper than Teamwork

If cost is the main concern, Zoho Projects and Trello are usually cheaper at smaller team sizes and still cover basic task tracking and collaboration.

However, Trello relies heavily on Power-Ups for timelines, reporting and time tracking, and still lacks native billable-hours tooling, while Zoho’s time tracking and resource management are less tightly coupled to profitability reporting than Teamwork’s agency-focused suite.

Researcher Verdict

“Teamwork can’t be used for interactive feedback sessions because it simply lacks the features needed. It can be used to create feedback surveys, which is useful for project managers to have within their PM platform.

Teamwork has a dedicated tab on its project screen for files, which makes them quite accessible and easy to find.

In a similar criticism to features in other stages, the button for inviting guests to a project was slightly difficult to find.”

James Macey, Senior Researcher
-

5. ClickUp: Best Value Project Management Platform

clickup Logo
ClickUp
4.6
Pricing $7-$12/user/month (USD only)
Quick overview

ClickUp comes in a very close second to monday.com, mainly falling short through a lack of a few key features. However, it makes up for this with its great affordability (scoring 4.4/5 when it comes to price), its ease of use (4.0/5) and its customer satisfaction (4.3/5).

It allows all plans to use a Gantt chart, kanban board, custom and preset templates, and a spreadsheet view, also letting users set milestones, sub-tasks and dependencies from the lowest plan onwards. It also allows for all of its security features (two-factor authentication, user permissions, and guest access) to be used from the free plan upwards.

The main place ClickUp could focus on improving is its collaboration features (project message board and online whiteboard), as well as its post-project features. Post-project features (like retro sessions and feedback gathering) let managers figure out the strong and weak points of the entire project process, allowing them to grow and improve that process in the future.

Strengths

Strong project creation and workflow features

Extremely affordable

Very fast and easy to use

Weaknesses

Not many post-project features available

Collaboration features could be expanded

Pricing
PlanPaid yearlyPaid monthly
Unlimited $7/user/month $10/user/month
Business $12/user/month $19/user/month
Enterprise Custom Custom

What are ClickUp’s key features?

  • Rich task management with list, board, Gantt and calendar views on core plans
  • Powerful no-code automations and native AI tools for updates, summaries and content
  • Sub-tasks, dependencies, custom fields, time tracking and goals for advanced workflows
  • iOS and Android apps with offline mode for basic task work across mobile and desktop
  • Excel/CSV and other file imports, plus bulk export and SOC 2, GDPR and HIPAA-aligned security
ClickUp boards page on free project management software
On ClickUp's kanban view, we could easily see the whole workflow pipeline, in a similar style to Trello. Source: Expert Market

How does ClickUp compare with other project management software?

ClickUp sits very close to monday.com at the top of our list, but it fills a slightly different niche. We see it as the “power user” choice: more knobs and dials than most tools, at a price that’s still accessible for UK SMBs.

ClickUp is cheaper overall than monday.com

Compared with monday.com, ClickUp is usually cheaper at like-for-like tiers and offers more granular configuration (nested spaces, lists, custom fields everywhere, very flexible automations).

We think monday.com is easier for non-technical teams to learn, with a simpler board structure and more opinionated templates. ClickUp asks for more set-up time but rewards that effort with greater control over how work is modelled.

If you want maximum configurability and are happy to invest in onboarding, ClickUp edges ahead. If you want “plug in and go” simplicity, monday.com still has the advantage.

ClickUp offers a stronger feature set than Asana and Jira

Against Asana, ClickUp offers broader functionality in one place (docs, whiteboards, mind maps, chat) plus deeper automations and AI, while Asana leans into structured task hierarchies and a very polished, streamlined UX.

For software teams weighing ClickUp against Jira, we think Jira remains the best fit for heavyweight agile at scale, but ClickUp is more approachable for cross-functional organisations that want development work, ops and marketing in the same tool, rather than split across multiple platforms.

Zoho Projects and Trello will be better fits for very small teams than ClickUp

Zoho Projects and Trello both undercut ClickUp on price and are easier to grasp for very small teams that mainly need simple task lists and kanban boards. However, they don’t match ClickUp’s combination of automations, AI, security certifications, offline-capable apps and rich import/export options.

If you’re a micro-business on a tight budget, Zoho Projects or Trello may still be enough. If you expect to scale or want one platform to handle projects, documentation and more advanced reporting, we think ClickUp is the stronger long-term choice.

Researcher Verdict

“ClickUp isn’t particularly suited for post-project feedback gathering but it is possible via workarounds. Arguably, users are probably better off using a platform dedicated for either surveys and retro sessions.

Their system for providing guest access appears comparatively more complex than other platforms, but gives the user more freedom to restrict their guest access from certain areas of a project.”

James Macey, Senior Researcher
-
Did You Know?

Boosting the efficiency of your processes is a great way of relieving your staff of unnecessary admin and therefore improving your employee satisfaction.

What’s the Best Project Management Software for Your Business?

Small businesses may benefit most from affordable or free platforms like monday.com and ClickUp, while medium-sized businesses often need stronger task management tools such as Jira, Wrike or Teamwork. For larger organisations, collaboration-focused platforms like Teamwork and ClickUp are ideal for managing bigger teams and more complex workflows.

Business sizeBest project management softwareWhy do we recommend them?
Small businessesmonday.com, ClickUpBoth offer free plans, making them cost-effective for startups and budget-conscious teams. Zoho Projects is the cheapest paid option while still offering strong core features
Medium-sized businessesJira, Wrike, TeamworkJira offers powerful task management at a fair price but is best for software teams. Wrike and Teamwork provide more general-purpose tools with strong usability and balanced pricing
Large businessesTeamwork, ClickUpStrong collaboration features, such as task comments, calendars, document editing and messaging tools, make them ideal for coordinating larger teams and complex projects

If you’d like in-depth looks at all the project management free plans on the market, here’s our list of the 7 Best Free Project Management Software.

Did You Know?

77% of high-performing projects use project management software and, at the price it’s at, there’s no reason not to try it out!

How Did We Find the Best Project Management Software?

We've tested and researched 10 market-leading project management software platforms, evaluating their functionality, usability, integrations and customer support so we can make the most useful recommendations to UK businesses.

Our rigorous testing process means these products have been scored and rated in five main categories of investigation and nine subcategories. We then gave each category score a ‘relevance weighting’ to ensure the product's final score perfectly reflects the needs and requirements of Expert Market readers.

Our main testing categories for project management software are:

  • Pricing: The financial considerations associated with using a project management solution, e.g. licensing fees, subscription plans or additional charges for advanced features or add-ons.
  • Ease of use: This is where we get people just like you to test out the products, and focus on evaluating the ease of use and user experience of the project management solution. We assess factors such as the user interface, navigation and task organisation.
  • Features: The functionalities and capabilities offered by the project management solution, including features such as task management, team collaboration, and project planning and scheduling.
  • Integrations: The number of third-party software platforms the system integrates with, and whether it easily connects with market-leading providers.
  • Security: The number of security measures offered by the providers, as well as accreditations for data security.
  • Customer Support: The assistance and resources provided by the project management solution provider to users, including phone support, email or chat support, and online forums.
Verdict: Which Project Management Software Is Right for Your Business?

monday.com emerged as the best project management software overall in our extensive hands-on testing and research. It combines an intuitive interface with powerful task management, strong automation tools, flexible project views and competitive pricing, making it suitable for a wide range of businesses.

Whether you’re a small business looking for an easy-to-use platform or a growing team that needs scalable workflows and collaboration features, monday.com delivers the best balance of usability, functionality and value.

Asana and Wrike were our strongest alternatives for businesses with more specific needs. Asana stands out for its extensive integrations and streamlined workflows, making it ideal for teams already using multiple software tools.

Wrike, meanwhile, offers more advanced task management and reporting features, making it better suited to larger teams or businesses managing complex projects at scale.

FAQs

How does ClickUp compare directly with monday.com?

ClickUp serves as the closest all-around rival to monday.com and is considered the “power user” choice. While monday.com offers simpler, opinionated templates and a cleaner interface for immediate onboarding, ClickUp provides more granular configuration (such as nested spaces and custom fields), deeper native automations and usually costs less per seat at comparable tiers. However, ClickUp features a steeper learning curve for non-technical teams.

Which project management software is best for app integrations?

Asana excels primarily as an integration-first platform. It offers a massive integrations marketplace that directly connects workspaces to major third-party platforms like Slack, Microsoft Teams, Google Workspace and Salesforce. This allows teams to deeply personalize their software ecosystems and coordinate cross-functional goals from within their daily communication channels.

Are there robust free project management software options available for small businesses?

Yes, both monday.com and ClickUp offer capable free plans that are highly recommended for budget-conscious small businesses trying to track routine work.

For teams that decide to transition to a paid plan on a tight budget, Zoho Projects stands out as the most affordable entry-level paid option available, without skimping on fundamental features like basic task tracking and cross-team resource management.

Written by:
Duncan Lambden
Duncan (BA in English Textual Studies and Game Design) is one of Expert Market's local Software Experts. His articles focus on ecommerce platforms and business software that allows small businesses to improve their efficiency or reach, with an emphasis on invoice financing, project management, and customer relations.
Reviewed by:
James has four years' experience as a researcher at Expert Market, covering categories from CRM to fleet management. He holds a Postgraduate Certificate in Social Research and spends hundreds of hours each month speaking to business owners and managers, as well as running product testing with the Expert Market team. Prior to Expert Market, he worked as a researcher in the construction industry